Home / Latest / NSW Govt promises momentous South Coast Rail Upgrade

NSW Govt promises momentous South Coast Rail Upgrade

Today the NSW Premier announced the largest investment in South Coast rail infrastructure ever.

https://www.nsw.gov.au/ministerial-releases/south-coast-rail-line-to-be-electrified-and-duplicated-largest-investment-rail-infrastructure-generations 

The Premier and his government promised the $6.8 billion upgrade should the Labour Government be returned to power at the March 2027 state election.

The commitment includes electrifying the Kiama to Bomaderry service and doubling the tracks at key bottlenecks.

SEATS commends the potential wins for the movement of freight to key industrial facilities that utilise the South Coast and T4 line every day. These key elements include:

  • Installation of additional tracks and passing loops between Wollongong to Kiama: this section is predominantly single track which limits freight and passenger train capacity and reliability. Additional tracks will allow increased capacity, more frequent services with regular stopping patterns.
  • Installing quadruple tracks between Hurstville to Sutherland: this section currently has two tracks which are shared by passenger and freight services on the South Coast Line and the T4 Illawarra Line. Doubling capacity will separate these two lines leading to increased frequency, capacity and reliability.

The detailed planning works for electrification and duplication will commence in 2027 and confirm the final scope and cost of the upgrades, with construction expected to be complete by the mid to late 2030s.

SEATS applauds this announcement even though it may be quite some time in the delivery. SEATS has seen the section of track between Hurstville and Sutherland as needing a major upgrade to allow freight trains to maintain momentum to handle the grades through this section. Having to utilise the same rail line as passenger services always limited the freight paths available to trains delivering export freight to the state’s ports at Kembla and Botany.

Similarly between Unanderra and Bomaderry, the mix of dual and single track, again limits the opportunity to co-utilise the track for freight and passenger services. SEATS does see the expenditure on providing additional tunnels between Bombo and Gerringong as an issue both in cost and the disruption during construction.

This positive announcement for the South Coast Rail Line will hearten those industries committed to utilising rail for the bulk of their freight and encourage further investment to generate more employment in the Illawarra-Shoalhaven region.

Join Our Mailing ListUpdates straight to your inbox!